|
Referendum Gold Property - Claim |
|
|
|
|
The Referendum Property is located within the Nelson Mining Division and consists of 3 reverted crown grants, 2 modified grid, 9 two post claims and 3 fractional claims totaling 1331.12 hectares (Figure 2). Claim information is listed in Table I.
| Claim | Type CLAIM | TENURE | UNITS HA | ISSUED | |
| RCG |
KATIE |
L4386 232883 |
1 |
25.000 |
19800408 |
| RCG |
REFERENDUM |
L4387 232884 |
1 |
25.000 |
19800408 |
| RCG |
GOLDEN CROSS |
L4388 232885 |
1 |
25.000 |
19800408 |
| MC4 |
TECGOLD |
233098 |
16 |
400.00 |
19830408 |
| MC2 |
TEC 1 |
233099 |
1 |
25.000 |
19830408 |
| MC2 |
TEC 2 |
233100 |
1 |
25.000 |
19830408 |
| MC2 |
TEC 3 |
233101 |
1 |
25.000 |
19830408 |
| MC2 |
TEC 4 |
233102 |
1 |
25.000 |
19830408 |
| MC2 |
TEC 5 |
233103 |
1 |
25.000 |
19830408 |
| MC2 |
TEC 6 |
233104 |
1 |
25.000 |
19830408 |
| MC2 |
TEC 7 |
233105 |
1 |
25.000 |
19830408 |
| MC2 |
#1 TEC FR. |
233969 |
1 |
25.000 |
19881 618 |
| MC4. |
TECGOLD 102 |
234128 |
16 |
400.000 |
19890425 |
| MC2 |
MONTY |
378776 |
1 |
25.000 |
20000718 |
| MCX |
TEC 8 |
507990 |
|
21.013 |
20050226 |
| MCX 5 |
|
510771 |
|
189.092 |
20050414 |
| MCX |
TEC 9 |
510823 |
|
21.012 |
20050415 |
| Totals |
|
|
|
|
1331.117 |
|